If your move crosses the water between the Southside and the Peninsula, the Hampton Roads Bridge-Tunnel is part of your moving plan whether you think about it or not. On a good day the crossing takes a few minutes. On a bad one, a backup at the tunnel entrance can hold your crew, your truck, and everything you own in traffic for an hour. Here is how our Virginia Beach moving crews think about HRBT tunnels and moving in Hampton Roads, and what you can do to keep move day on schedule.
Why the HRBT Matters on Move Day
The HRBT carries I-64 between Hampton and Norfolk. For moves between Virginia Beach or Norfolk and Hampton, Newport News, Yorktown, or Williamsburg, it is usually the most direct route. It is also one of the most familiar chokepoints in the region. A lane closure, a stalled car, or an over-height truck being turned around at the tunnel island can slow traffic in both directions.
That matters for one simple reason. Tidal Town Moving charges an hourly rate, and the clock runs from the moment the crew arrives until the last item is placed in your new home. The drive between your old address and your new one sits inside that window. We do not charge travel time fees or fuel surcharges within Hampton Roads, but time spent sitting at the tunnel between your two homes is still time on the job. When it comes to HRBT tunnels and moving in Hampton Roads, planning the crossing is one of the easiest ways to keep your final bill close to your estimate.
Where the HRBT Expansion Stands Right Now
The HRBT Expansion is the largest highway construction project in Virginia history. The $3.9 billion project adds twin tunnels, new marine bridges, and widened lanes along a roughly 10-mile stretch of I-64 between Hampton and Norfolk.
| Milestone | Timing | What it means for your move |
|---|---|---|
| Twin tunnel boring finished | 2025 | The heaviest underground work is done, but surface work continues |
| Substantial completion (VDOT target) | February 26, 2027 | New lanes and tunnels expected to open to traffic |
| Final completion (VDOT target) | August 27, 2027 | Remaining work in the corridor wraps up |
Until the new lanes open, expect work zones, shifting lane patterns, lower speed limits, and occasional overnight closures. Even after substantial completion, some construction will continue in the area until final completion. If your move falls anywhere in that window, plan for the crossing to be less predictable than it will eventually be.
The Three Crossings Movers Weigh
The HRBT is not the only way across. Depending on where you are moving from and to, one of the other crossings may be shorter anyway, and it gives the crew a fallback when the HRBT backs up.
| Crossing | Connects | Often the better fit for |
|---|---|---|
| Hampton Roads Bridge-Tunnel (I-64) | Hampton and Norfolk | Virginia Beach or Norfolk to Hampton, Yorktown, or Williamsburg |
| Monitor-Merrimac Memorial Bridge-Tunnel (I-664) | Newport News and Suffolk | Chesapeake or Suffolk to Newport News, or a detour when the HRBT is jammed |
| James River Bridge (US-17) | Newport News and Isle of Wight County | Smithfield and Carrollton moves to or from the Peninsula, with no tunnel at all |
Before move day, our crew looks at live conditions and picks the crossing that makes sense for that route at that hour. A detour that adds a few miles can still save time if the tunnel approach is at a standstill.
What Movers Plan For Before Crossing
Truck height – The older westbound HRBT tube has a lower clearance than the eastbound tube, and VDOT runs over-height detection on the approaches. A truck that trips the sensors gets stopped and turned around, which is a delay nobody wants. Crews know the exact height of their truck and plan the route around it.
Load security – Tunnel traffic means stop and go driving. A well-packed truck with furniture padded and strapped in place handles that without shifting. This is one more reason to let the crew load in the order they choose.
Items that stay off the truck – Propane tanks, gasoline, and other flammables do not travel on a moving truck, tunnel or not. Our guide to what movers will not move covers what to set aside before the crew arrives.
Your own route – If you are driving separately, take the same crossing as the truck or leave early enough that you are at the new place first. A crew that arrives to a locked door is a crew on the clock with nothing to unload into.
How to Time a Move That Crosses the Water
The right timing for HRBT tunnels and moving in Hampton Roads comes down to a few habits. You cannot control traffic, but you can stack the odds in your favor.
- Book a morning start. An early arrival usually means loading finishes and the truck crosses before afternoon traffic builds.
- Pick your day with traffic in mind. Summer weekends bring beach traffic, and holiday weekends are heavier across the board. A midweek move often has a calmer crossing.
- Check Virginia 511 the night before and the morning of. Planned closures and lane shifts are posted ahead of time.
- Have the new home ready. Keys in hand, elevator reserved if you are moving into an apartment, and parking cleared for the truck.
- Book early enough to get the time slot you want. Our guide on how far in advance to book movers breaks down lead times by season.
For a full picture of how the day runs once the crew shows up, read what to expect on moving day.
What Changes After the Expansion Opens
Once the new tunnels and lanes open, the corridor will have more capacity in both directions, which should take pressure off the single-lane bottlenecks that cause so many backups today. That said, more lanes do not make traffic disappear. Accidents, weather, and peak hours will still affect the crossing. If you are planning a move for 2027, ask about current conditions when you book, since the corridor will still be changing for part of that year.
Planning a Move Across the Water?
Whether you are heading from Virginia Beach to Hampton, from Norfolk to Newport News, or up to Yorktown, our crews plan the route before the truck rolls. You can check typical numbers on our moving prices page or request a free quote and tell us both addresses so we can plan your crossing from the start.
FAQs
Does tunnel traffic change what I pay for my move?
It can. Tidal Town Moving charges hourly from arrival until the last item is placed, and the drive between your two homes is part of that time. There are no travel time fees or fuel surcharges within Hampton Roads, so the only added cost from a backup is the extra time on the clock.
Can movers avoid the HRBT completely?
Often, yes. The Monitor-Merrimac Memorial Bridge-Tunnel on I-664 and the James River Bridge on US-17 both cross the water, and one may be the shorter route for your addresses. The crew checks live conditions and picks the crossing that makes sense on the day.
When will the HRBT expansion be finished?
VDOT’s revised schedule targets substantial completion, when the new lanes and tunnels open to traffic, on February 26, 2027, and final completion on August 27, 2027.